Managing Hospital Electrical Shutdowns (B)
Program Code:
284473
Date:
Monday, July 16, 2012
Time:
3:15 PM to 4:30 PM
EST
PRIMARY SPEAKER
:
David Stymiest,
PE, CHFM, CHSP, FASHE, Senior Consultant,
Smith Seckman Reid, Inc.
David Stymiest P.E., CHFM, CHSP, FASHE is a nationally recognized speaker, trainer and author. He is presently a Senior Consultant at Smith Seckman Reid, Inc. providing a variety of compliance consulting services to SSR's healthcare clients. Before joining SSR, he was Senior EE for more than 10 years for Massachusetts General Hospital and the other hospitals of Boston-based Partners HealthCare System. David has over 40 years intensive professional experience in facilities and electrical engineering for health care, institutional, industrial, commercial, civil works, transportation, and electrical utility projects. He has also been an Owner and hospital engineer. He is acknowledged as a forward-thinking leading industry expert in the management, operation, testing, and application of emergency power systems in health care facilities. He is a CHFM, CHSP, ASHE Fellow and Registered PE in three states. David is Chairman of the NFPA Technical Committee on Emergency Power Supplies, which is responsible for NFPA 110 and NFPA 111.
|
CO-SPEAKER
:
Mr. Jason D'Antona, PE, LEED AP, Principal, Thompson Consultants Inc.
Description
Hospitals must face the inevitability of more electrical shutdowns as NFPA 70E-2012: Standard for Electrical Safety in the Workplace becomes yet more stringent and other needs require shutdown of the hospital’s electrical system. Electrical equipment requires regular repair or maintenance, yet this critical work is often deferred because it is too difficult to gain approval to turn off the power. As well, some Centers for Medicare and Medicaid Services validation surveyors have been requesting evidence of circuit breaker inspections and periodic exercising, which can necessitate shutdowns at various levels of the hospital power system, including hospital mains. This session will enable you to—
• Demonstrate the need to plan, communicate, train, and conduct safe, effective building-wide electrical shutdowns based on specific case studies and lessons learned.
• Compare previous NFPA 70E editions with the 2012 edition in terms of the need to increase focus on electrical arc flash safety.
LEARNER OUTCOMES:
-
Describe how to manage safe hospital electrical shutdowns.
-
Describe how to perform Shutdown Risk Assessments.
-
Describe how to sell shutdowns to risk-averse administrators and clinicians.
-
Discuss how to train clinicians in this EC aspect.