Session Information
ASHE 2010 47th Annual Conference and Technical Exhibition
Click here to go to the previous page
Combining the Old with the New Provides Highest In-Service Efficiency
Track : Tuesday, July 13, 2010
Program Code: 170
Date: Tuesday, July 13, 2010
Time: 1:45 PM to 3:00 PM  EST
Location: Room 13-14
PRIMARY SPEAKER :
 Steve Connor, Over 40 years in the energy conversion industry, Director of Marketing Services, Cleaver Brooks
Description
This case study examines a northeastern hospital that faced a reduced steam load, high energy costs, and the probable replacement of two old firetube boilers that were significantly oversized for the need. Rationalizing the reduced steam requirement while using in-­service efficiency criteria as the screening tool led to a boiler system that not only saved capital costs but also resulted in significant improvements in energy costs and greatly reduced the carbon footprint.This session will enable you to—
• Assess your boiler plant as it relates to proper load match for optimum boiler efficiency.
• Discuss in­-service Efficiency and its application in proper boiler selection.

  • Acquaint the audiance with the latest in new boiler technology
  • Apprise the audiance of what "In Service Efficiency" is and how it can be applied for proper boiler selection.
  • Assess their own boiler plant as it relates to proper load match for optimum boiler efficiency.


Audio Synchronized to PowerPoint
(Code: 170)
  
This session is a part of:
Handout Online
(Code: 170)
Attendee: Free
  
This session is a part of: